Skip to main content

Not dead yet

Well, more than a month since my last post, now I owe eight. That would be because I spent most of the rest of September finishing two garments for my IK submission package and doing four swatches.

I still haven't finished Manhattan.

However, two weekends ago I finished the back of Norah Gaughan's Ribbed Lace pullover from GOL, and I'm half-way up the front. Which reminds me, I should measure and plan for the front neck bind-off, since it's lower than the back. I'm shortening this garment by three or four inches, because I'm 5'3" and don't need another 25-inch-long sweater. Oversized isn't my thing these days.

I also started a sleeve on "From Selbu to Sahara" from Norsk Strikkegarn. I'm thinking I'll revise the rules about how many balls a garment knit from a cone counts as, because I just can't imagine only getting nine "points" for this sweater. Maybe if something is knit in fair isle at more than 6 stitches per inch, a sleeve should count as three and a back or a front should count as four. That would make "S->S" be 15 points, far more reasonable.

Popular posts from this blog

Best TW feedback ever

Over at the dayjob, SMEs are feverishly trying to get documents back to me all marked up, in preparation for the release that's supposed to happen the week I'm back from VP. Today's best comment: Unfortunately not true. SMEs, they're so cute.

In progress: August 2024

Wind/Water/Salt  Chapters 39-51:   Still n eed to take up comments and revise.  Persephone  (probably not its real name): Continued to think thoughts.  Short Stories:   After posting that short story from last month onto the workshop, I picked one of those short stories I'd started and forced a plot onto it.  Critted  5  Got back  4 Submissions  0  Out there   0   Rejects   0 Knitting Cathar  (self). Started month with two inches done above the armholes. Listening to audiobooks, I finished the fair isle portion, cut the steeks, and set up and knit the neckline. Just the endless finishing now.   Blushing Cloud  (Knitty S/S24). Started the month with (still) three inches of back done. Socks take priority.  Elbrus socks (Knitty first fall 2024). Finished.  Elbrus socks II . Started the first.  Pole shorts  (Joan McGowan-Michael). I knitted these several years ago, but the...

Moraine

So a couple of days I thought I was done with this short story, and I wrote the last line of the story. I even dated it (that's how I can tell it's over). It was a little long, at 6600 words (I was aiming for 5000). But then I was walking to work, and I thought, "My, that was a lame ending. My endings are all crap." So yesterday morning, I scribbled out the date and wrote a bit more. And this morning I wrote a bit more again, and I dated it and called it done. And still, that ending seemed lame. So a few minutes later, in the last paragraph, I scratched out "the Oak Ridges Moraine" and wrote in "that stupid moraine". Much better. Now I can move on. But in the meantime, I was doing a little research about the Moraine, and I discovered that EGTourGuide lives on it. Only by one or two hundred feet, but I thought it was funny. Good for you, EGTourGuide, with all those excellent plants growing on that substandard soil, where in the olden days (you kno...