Skip to main content

In Progress -- July 2017



Daily efforts (formerly 1st draft)
Read Vinterlys.
Finished that short story and sent it out.

Accomplishments (formerly Editing)
uh... finished that story and sent it out?

Connecting
Critted 3
Got back 0 
haven't actually posted anything lately so that's my fault. I did renew myself on OWW though. 

Circulating
1

Knitting
Ann Boleyn (1998).  Last month I was around the hips, knitting downward. This month 8 rows.
Okracoke cardigan (Shirley Paden). Started the month with 16 inches. Now I have 23.5 inches of the back and just finished the decreases for the armholes. I'm still on the first piece after starting on boxing day, and this sweater literally makes me maudlin when I work on it.
Nomia sock (Knitty SS 2017). Finished the second sock. Win!
Slow Fade sock (Knitty FF 17). Started the first one. Great car project.
Celtic Gang Girls of the 70’s (Rowan and me). Did first sleeve and started a second. Boy do I hate intarsia.

Popular posts from this blog

In progress: March 2026

Wind/Water/Salt Chapters 39-51 :   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Working on Chapter 3 still, though this one seems more stable. I did work on it quite a bit during Chapter 2. 1-3 are in the same locale so it made sense to work on them together. Maybe I'll continue in this vein, doing the next locale all together too.  Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). I added markers at each pattern repeat. Hopefully that will make it easier to work on.   Summer in Tokyo  (Isager):Started the month with eleven rows left on the second sleeve, the yoke, and the finishing to go. And as I wanted, I finished this and now I can wear it for a little while before sweater weather is over until fall. I could not follow the yoke short row instructions as written so I did my best to make it look like th...

In progress - January 2026

  Wind/Water/Salt  Chapters 39-51:   Nothing  Persephone  (probably not its real name): NOthing Vinterlys:  Worked on Chapter 2 some more.  Critted  4  Got back  1 Submissions  0  Out there   0   Rejects   0 Knitting Georgia  (Norah Gaughan). Started the month with one sleeve and half a front to go. Finished. Love this sweater.  Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager): Started. I was looking at the pictures and the charts, and the pattern as written is not what is in the pictures! So odd. I am going to finish up two cones of yarn with this project! Pretty exciting. I hope I don't run out of light blue.  I was working along on it, and if you go and look at the sweater, it's knit bottom-up, and I was at the part where I only had two colors, about 5" maybe. And I was thinking, "wow, this is pretty ugly! Maybe I should stop...

In progress -- February 2026

Wind/Water/Salt  Chapters 39-51:   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Decided it's time to move on from Chapter 2, posted it and now I guess I'll work on Chapter 3 for 6 months.   Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager):Started the month maybe 14 rows from the armholes. I finished the body and a sleeve. It would be nice to be able to wear this in March. So, eleven rows of a sleeve, the yoke, and the finishing to go. Ankylosaur  (Knitty). Ed shrank his, so I guess they're mine now? I started another pair for him because he was so sad, and also because socks are portable so it's always good to have one going.  Sashiko project:   Nothing.  Ruffle skirt:  Did the waistband and I'm calling i...