Skip to main content

In process, june 2015



First Draft
 “Wind/Water/Salt”. Wrote three missing scenes, adding characters, making tension.
“The Dead belong to Me.” Short story, started.

Editing
“Wind/Water/Salt”. Chapters 39 to end edited. Put in some missing scenes, and added a ton of missing characters. They need to be fleshed out at the beginning too now. How can I have written so much without defining so many characters? Seems like I knew all sorts of stuff that happened, but I didn’t write it down until now. This draft is so much better than the previous. I love editing.

Connecting
--

Circulating
2

Knitting
“Ceremonial Armour” (Kaffe Fassett, knit from a photo). Did not finish tying in ends. Did not buy beads. Did not crochet edging. Maybe next month.
“St. Anthony’s Ribbon” (self-designed). Got the needle from Rust Damask Jacket so I could do the neck edging. Finished and blocked and put in a box. Not sure I’m happy with the neck, but wearing it might make it better, and I can’t do that right now because it’s summer.
Vinterlys (Norsk Strikkedesign). Did the last 26 rows of the “front” of the sleeve so Rust Damask Jacket could have the needle, then finished the “back” so I can figure out if I have enough on the fronts. Still can’t tell – need to steek and cut and seam first maybe, then pin it all out.
Rust Damask Jacket (Takle & Kolstadt). Started fair isle portion of body.
Honey for the Bee. Socks. Carry-around project. Finished, mostly in the car while driving back and forth from New Hampshire. 
Prow pullover (IK Summer 2014). Started, for an easy project; did about 2 inches.

Finished sewing a dress. Started a tunic, learned to make bias tape.

Popular posts from this blog

Best TW feedback ever

Over at the dayjob, SMEs are feverishly trying to get documents back to me all marked up, in preparation for the release that's supposed to happen the week I'm back from VP. Today's best comment: Unfortunately not true. SMEs, they're so cute.

In progress: August 2024

Wind/Water/Salt  Chapters 39-51:   Still n eed to take up comments and revise.  Persephone  (probably not its real name): Continued to think thoughts.  Short Stories:   After posting that short story from last month onto the workshop, I picked one of those short stories I'd started and forced a plot onto it.  Critted  5  Got back  4 Submissions  0  Out there   0   Rejects   0 Knitting Cathar  (self). Started month with two inches done above the armholes. Listening to audiobooks, I finished the fair isle portion, cut the steeks, and set up and knit the neckline. Just the endless finishing now.   Blushing Cloud  (Knitty S/S24). Started the month with (still) three inches of back done. Socks take priority.  Elbrus socks (Knitty first fall 2024). Finished.  Elbrus socks II . Started the first.  Pole shorts  (Joan McGowan-Michael). I knitted these several years ago, but the...

Moraine

So a couple of days I thought I was done with this short story, and I wrote the last line of the story. I even dated it (that's how I can tell it's over). It was a little long, at 6600 words (I was aiming for 5000). But then I was walking to work, and I thought, "My, that was a lame ending. My endings are all crap." So yesterday morning, I scribbled out the date and wrote a bit more. And this morning I wrote a bit more again, and I dated it and called it done. And still, that ending seemed lame. So a few minutes later, in the last paragraph, I scratched out "the Oak Ridges Moraine" and wrote in "that stupid moraine". Much better. Now I can move on. But in the meantime, I was doing a little research about the Moraine, and I discovered that EGTourGuide lives on it. Only by one or two hundred feet, but I thought it was funny. Good for you, EGTourGuide, with all those excellent plants growing on that substandard soil, where in the olden days (you kno...