Skip to main content

In process: Feb 2011

First Draft

“In a Nutshell”. 35 pages -- first draft finished.

Next up will be Limering, And maybe One Degree.


Editing

"The Rabbits". I tagged all the Thea’s Brain sections to make them make sense, and I need to fix the pacing now. It takes way too long to get to the brain stuff. I’d like to pump the atmosphere maybe, too.

"Apophis." Working on fourth draft.


Ignoring

“Succubus”.

Zombies.

Troll.

Pampelmouse.

“Bezoar”. One more draft, I think, and it might be done.

“Dowsing”. I need to change the POV (taking what I learned from reading those Caitlin Kiernan stories, actually – she does a neat thing where the main character is not the “special” character, but is the one looking at them. I will try that and see how it works for me.) so that there’s an actual plot, conflict, etc. I think there’s a good story in there.

Imp face.

Being reviewed

Nothing. Again.

Knitting
Morrigan. Ignoring, actually.
Anhinga. Finished. Worn 4x. Very happy with this sweater.
Doubleknit Fair Isle shawl. Eight stripes done, maybe 20% of entire garment.
Carnaby skirt. Started and finished in Feb. I'm wearing it now.

Popular posts from this blog

Best TW feedback ever

Over at the dayjob, SMEs are feverishly trying to get documents back to me all marked up, in preparation for the release that's supposed to happen the week I'm back from VP. Today's best comment: Unfortunately not true. SMEs, they're so cute.

In progress: August 2024

Wind/Water/Salt  Chapters 39-51:   Still n eed to take up comments and revise.  Persephone  (probably not its real name): Continued to think thoughts.  Short Stories:   After posting that short story from last month onto the workshop, I picked one of those short stories I'd started and forced a plot onto it.  Critted  5  Got back  4 Submissions  0  Out there   0   Rejects   0 Knitting Cathar  (self). Started month with two inches done above the armholes. Listening to audiobooks, I finished the fair isle portion, cut the steeks, and set up and knit the neckline. Just the endless finishing now.   Blushing Cloud  (Knitty S/S24). Started the month with (still) three inches of back done. Socks take priority.  Elbrus socks (Knitty first fall 2024). Finished.  Elbrus socks II . Started the first.  Pole shorts  (Joan McGowan-Michael). I knitted these several years ago, but the...

Moraine

So a couple of days I thought I was done with this short story, and I wrote the last line of the story. I even dated it (that's how I can tell it's over). It was a little long, at 6600 words (I was aiming for 5000). But then I was walking to work, and I thought, "My, that was a lame ending. My endings are all crap." So yesterday morning, I scribbled out the date and wrote a bit more. And this morning I wrote a bit more again, and I dated it and called it done. And still, that ending seemed lame. So a few minutes later, in the last paragraph, I scratched out "the Oak Ridges Moraine" and wrote in "that stupid moraine". Much better. Now I can move on. But in the meantime, I was doing a little research about the Moraine, and I discovered that EGTourGuide lives on it. Only by one or two hundred feet, but I thought it was funny. Good for you, EGTourGuide, with all those excellent plants growing on that substandard soil, where in the olden days (you kno...