Same place as last month's burnt-out car. Those are patched bullet holes.
Wind/Water/Salt Chapters 39-51: Still need to take up comments and revise.
Persephone (probably not its real name): Thought thoughts mostly. They were good thoughts though, probably useful.
Short Stories: Finished that one I meant to finish in February, posted it to OWW. It was pretty nice to pull something else out of the backlog. April's goal will be to finish that one. I think it's doable.
Critted 4 Got back 2
Submissions 0 Out there 0 Rejects 0
Knitting
- Cathar (self). Started the month with 25 rows until the armholes. Maybe six now?
- Morning Brew (Coffeehouse Knits). Started the month with 4 more inches to the armholes. Got there! error in pattern.
- Tiny Twists Socks (the second pair). Started the month halfway down the leg of the second. Turned the heel.
- Blushing Cloud (Knitty S/S24). I had some yarn that I thought would work so I tried it out. The sleeves are too long for me (my favorite sweater has sleeves that are 3" above my wrists) so I've made some mods already. I knitted maybe an inch.
Sashiko project: Nothing.
Ruffle skirt: Nothing.