Skip to main content

In progress: December 2023

Wind/Water/Salt Chapters 39-51: Still need to take up comments and revise. 

Persephone (probably not its real name): Thought thoughts mostly. 
Short Stories: More editing strategies. I think another day or two of words and I'll call it a second draft, and start a third. 
Critted 3 Got back 0  
Submissions 0 Out there 0 Rejects 0
Knitting
  • Cathar (self). Started the month with the fair isle portion barely started. Did not progress.
  • Braids (self). Started the month with just the hood and hem to go. Started the hood a few times, did not make great progress for a few weeks, then I realized what to do in conversation with Alex, and finished the hood for New Year's Eve after only four days of work. 
  • Tiny Twists socks (Pop socks: Colorful patterns by Knit Picks). Started the month on the heel of the first. Finished.
  • Beady-eyed owls. Last of the Christmas socks, for this year anyway. Started and finished. 
  • Morning Brew (Coffeehouse Knits). There's some math involved as I'm using Frangipani so I'm under gauge, but I finished the rib and started the body. Good, mindless knitting. 

Sashiko project: Nothing.  
Ruffle skirt: Also nothing. 

I did repair four things, though. That's something. 

Popular posts from this blog

Best TW feedback ever

Over at the dayjob, SMEs are feverishly trying to get documents back to me all marked up, in preparation for the release that's supposed to happen the week I'm back from VP. Today's best comment: Unfortunately not true. SMEs, they're so cute.

In progress: August 2024

Wind/Water/Salt  Chapters 39-51:   Still n eed to take up comments and revise.  Persephone  (probably not its real name): Continued to think thoughts.  Short Stories:   After posting that short story from last month onto the workshop, I picked one of those short stories I'd started and forced a plot onto it.  Critted  5  Got back  4 Submissions  0  Out there   0   Rejects   0 Knitting Cathar  (self). Started month with two inches done above the armholes. Listening to audiobooks, I finished the fair isle portion, cut the steeks, and set up and knit the neckline. Just the endless finishing now.   Blushing Cloud  (Knitty S/S24). Started the month with (still) three inches of back done. Socks take priority.  Elbrus socks (Knitty first fall 2024). Finished.  Elbrus socks II . Started the first.  Pole shorts  (Joan McGowan-Michael). I knitted these several years ago, but the...

Moraine

So a couple of days I thought I was done with this short story, and I wrote the last line of the story. I even dated it (that's how I can tell it's over). It was a little long, at 6600 words (I was aiming for 5000). But then I was walking to work, and I thought, "My, that was a lame ending. My endings are all crap." So yesterday morning, I scribbled out the date and wrote a bit more. And this morning I wrote a bit more again, and I dated it and called it done. And still, that ending seemed lame. So a few minutes later, in the last paragraph, I scratched out "the Oak Ridges Moraine" and wrote in "that stupid moraine". Much better. Now I can move on. But in the meantime, I was doing a little research about the Moraine, and I discovered that EGTourGuide lives on it. Only by one or two hundred feet, but I thought it was funny. Good for you, EGTourGuide, with all those excellent plants growing on that substandard soil, where in the olden days (you kno...