Skip to main content

In progress -- November 2022

Wind/Water/Salt Chapters 39-51: Still need to take up comments and revise. 

Persephone (probably not its real name): Worked more on the ending (which despite what I wrote last month wasn't done, just rewritten what I'd written before). The one POV's ending is kind of done-ish, and I had a revelation about the other POV's, which makes the whole story make sense. 
Short Stories: Went through all the comments on the one I put up last month and pulled out another one from the archive. Then the boy challenged me to read the crits on the one I posted recently, so I did, and we talked about the ending, so maybe I'll work on that. Then I was reading twitter which gave me an idea about how to fix another story, which I started to do instead. The point is, lots of plans, no action. 
Critted 9 Got back 4 
Did I mention I decided to scale back my reviews to two per week to give myself time to actually work on my own projects? I did. Did I work on my own projects? Hahahahaha. 
Submissions 0 Out there 1 Rejects 0

Knitting
  • Striped long-sleeved t-shirt (self).  Would have worked on this, except for the socks. 
  • Tay Tartan cardigan (Martin Storey). Decided I need to use the needle on something else, so this had to be finished. I did maybe 8 rows. 57 to go, then the endless finishing!
  • Extra Whip socks (Coffeehouse knits). Finished the ninth, tenth, and eleventh socks, started the thirteenth (complicated story. I'm pretty sick of socks, but Christmas is almost here. 
Sashiko project: I didn't work on it because I think it's going to be too long and dowdy. Shortening it now is easy. 

Popular posts from this blog

In progress: March 2026

Wind/Water/Salt Chapters 39-51 :   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Working on Chapter 3 still, though this one seems more stable. I did work on it quite a bit during Chapter 2. 1-3 are in the same locale so it made sense to work on them together. Maybe I'll continue in this vein, doing the next locale all together too.  Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). I added markers at each pattern repeat. Hopefully that will make it easier to work on.   Summer in Tokyo  (Isager):Started the month with eleven rows left on the second sleeve, the yoke, and the finishing to go. And as I wanted, I finished this and now I can wear it for a little while before sweater weather is over until fall. I could not follow the yoke short row instructions as written so I did my best to make it look like th...

In progress - January 2026

  Wind/Water/Salt  Chapters 39-51:   Nothing  Persephone  (probably not its real name): NOthing Vinterlys:  Worked on Chapter 2 some more.  Critted  4  Got back  1 Submissions  0  Out there   0   Rejects   0 Knitting Georgia  (Norah Gaughan). Started the month with one sleeve and half a front to go. Finished. Love this sweater.  Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager): Started. I was looking at the pictures and the charts, and the pattern as written is not what is in the pictures! So odd. I am going to finish up two cones of yarn with this project! Pretty exciting. I hope I don't run out of light blue.  I was working along on it, and if you go and look at the sweater, it's knit bottom-up, and I was at the part where I only had two colors, about 5" maybe. And I was thinking, "wow, this is pretty ugly! Maybe I should stop...

In progress -- February 2026

Wind/Water/Salt  Chapters 39-51:   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Decided it's time to move on from Chapter 2, posted it and now I guess I'll work on Chapter 3 for 6 months.   Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager):Started the month maybe 14 rows from the armholes. I finished the body and a sleeve. It would be nice to be able to wear this in March. So, eleven rows of a sleeve, the yoke, and the finishing to go. Ankylosaur  (Knitty). Ed shrank his, so I guess they're mine now? I started another pair for him because he was so sad, and also because socks are portable so it's always good to have one going.  Sashiko project:   Nothing.  Ruffle skirt:  Did the waistband and I'm calling i...