Skip to main content

In process -- May 2013



First Draft
Even this section took a hit this month, because I decided Selkies needed a middle section, and wrote one that was 16 pages long. 

“This is the Church, and This is the Steeple”. Short story, probably benefitted from the Selkie story break because now I can see the end. 

 Editing



“Selkie Girls are Easy.” I don’t know how I thought the first draft of this one wasn’t “that bad” because oh my god it was a mess. There was a missing sequence near the beginning. I wrote it as page-a-day for a few days. That whole thing about how writing is revision, and without some words on the page you have nothing to work with, I guess that’s true. I wish I could write better first drafts, but maybe I have to accept that this is just how I work.
Probably the most radical draft 2 change I’ve ever done. The story grew by something like 4000 words, even though I deleted tons.  


Connecting

I tweeted like once. I commented nowhere. Rather than connecting more, I actually quit an email list about writing, mostly because I never read any of the emails, no longer belonged to the forum they related to, and just found the whole thing stressful. This depressed me a little, but it had to be done for my own sanity. I couldn’t even open the mailbox anymore, for days on end, it was so daunting. I am an epic fail at the social media. 

But actually, quitting the forum meant I could open that mailbox again without feeling overwhelmed, so I guess it’s a win, because now I can connect with the things that are left. 




Circulating

2 out there.

7 rejects for 2013 so far. I need to finish more stories if I’m going to get this to 50, which is the goal.
 



Knitting

“Biohazard”. (pullover) I finally finished the unattached portion of the second sleeve so I could join everything and do the FI section. Then I finished the sleeves and the front. So, just the upper back and neckline to go.

“Ceremonial Armour”.
KF cardigan. No real progress – but this is my “hard” project until I’m done the FI portions.

“Sunberry socklets”. Hated the toe. My feet are roman, not Turkish, I guess. Ripped it out and made it less pointy, which was really easy, so I’m good. Finished.

IK Vertex cardigan spring 2013. I had some wildly inappropriate BFL that I couldn’t remember what I bought it for, so I did the math to make it work for this. It’s wildly inappropriate because of the Christmas color scheme (parrot, not sure why) and the completely wrong gauge. Somehow I was hoping when I wound it from giant skein into ball(s because it got too big for the winder) it would look more subtle,  but instead it got worse. Maybe the blue will pool! But I doubt it. I may never wear this sweater, but it’s a nice shape, so I’m giving it a shot.
 


Popular posts from this blog

In progress: March 2026

Wind/Water/Salt Chapters 39-51 :   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Working on Chapter 3 still, though this one seems more stable. I did work on it quite a bit during Chapter 2. 1-3 are in the same locale so it made sense to work on them together. Maybe I'll continue in this vein, doing the next locale all together too.  Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). I added markers at each pattern repeat. Hopefully that will make it easier to work on.   Summer in Tokyo  (Isager):Started the month with eleven rows left on the second sleeve, the yoke, and the finishing to go. And as I wanted, I finished this and now I can wear it for a little while before sweater weather is over until fall. I could not follow the yoke short row instructions as written so I did my best to make it look like th...

In progress -- February 2026

Wind/Water/Salt  Chapters 39-51:   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Decided it's time to move on from Chapter 2, posted it and now I guess I'll work on Chapter 3 for 6 months.   Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager):Started the month maybe 14 rows from the armholes. I finished the body and a sleeve. It would be nice to be able to wear this in March. So, eleven rows of a sleeve, the yoke, and the finishing to go. Ankylosaur  (Knitty). Ed shrank his, so I guess they're mine now? I started another pair for him because he was so sad, and also because socks are portable so it's always good to have one going.  Sashiko project:   Nothing.  Ruffle skirt:  Did the waistband and I'm calling i...

In progress - January 2026

  Wind/Water/Salt  Chapters 39-51:   Nothing  Persephone  (probably not its real name): NOthing Vinterlys:  Worked on Chapter 2 some more.  Critted  4  Got back  1 Submissions  0  Out there   0   Rejects   0 Knitting Georgia  (Norah Gaughan). Started the month with one sleeve and half a front to go. Finished. Love this sweater.  Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager): Started. I was looking at the pictures and the charts, and the pattern as written is not what is in the pictures! So odd. I am going to finish up two cones of yarn with this project! Pretty exciting. I hope I don't run out of light blue.  I was working along on it, and if you go and look at the sweater, it's knit bottom-up, and I was at the part where I only had two colors, about 5" maybe. And I was thinking, "wow, this is pretty ugly! Maybe I should stop...