Skip to main content

In Process -- Dec 2012



First Draft
“Fairfax”. Around 143K and done, finished on 16 Dec, 2012.
“ESD Issues”. A flash.
“Royal Purple”. A short story finished new year’s day actually.

Editing

66885 – I’d done about two drafts. For some reason I didn’t save it at some point, so I had to do some work again which is lame. For once, I thought there wasn’t enough detail, so I added rather than removing content. This was different for me, that’s for sure. I was able to trick myself into editing it (two more drafts!) by saying I was just going to sit down and give it a read-through, but holding a pen just in case.




Knitting
Biohazard (pullover) Finished first sleeve, started second.
CTH’s Marielund. Fronts, sleeves, finishing. The buttons are from Martha’s Vineyard. I was afraid it was going to be too small, but being rib it stretched nicely.
“Ceremonial Armour”. KF cardigan.Didn't work on it.
“Tinker” socks.  Finished #3 and 4.
“Tenny Park.” Bought the long-repeat sockweight yarn in Pennsylvania on summer vacation, using some Briggs&Little sport for the rest. My first foray into entrelac! It went fine. I started the body on the specified needles, but after 5 inches decided it was too tight and under gauge and started again. I don't think this will take long.
 

Popular posts from this blog

Best TW feedback ever

Over at the dayjob, SMEs are feverishly trying to get documents back to me all marked up, in preparation for the release that's supposed to happen the week I'm back from VP. Today's best comment: Unfortunately not true. SMEs, they're so cute.

In progress: August 2024

Wind/Water/Salt  Chapters 39-51:   Still n eed to take up comments and revise.  Persephone  (probably not its real name): Continued to think thoughts.  Short Stories:   After posting that short story from last month onto the workshop, I picked one of those short stories I'd started and forced a plot onto it.  Critted  5  Got back  4 Submissions  0  Out there   0   Rejects   0 Knitting Cathar  (self). Started month with two inches done above the armholes. Listening to audiobooks, I finished the fair isle portion, cut the steeks, and set up and knit the neckline. Just the endless finishing now.   Blushing Cloud  (Knitty S/S24). Started the month with (still) three inches of back done. Socks take priority.  Elbrus socks (Knitty first fall 2024). Finished.  Elbrus socks II . Started the first.  Pole shorts  (Joan McGowan-Michael). I knitted these several years ago, but the...

Moraine

So a couple of days I thought I was done with this short story, and I wrote the last line of the story. I even dated it (that's how I can tell it's over). It was a little long, at 6600 words (I was aiming for 5000). But then I was walking to work, and I thought, "My, that was a lame ending. My endings are all crap." So yesterday morning, I scribbled out the date and wrote a bit more. And this morning I wrote a bit more again, and I dated it and called it done. And still, that ending seemed lame. So a few minutes later, in the last paragraph, I scratched out "the Oak Ridges Moraine" and wrote in "that stupid moraine". Much better. Now I can move on. But in the meantime, I was doing a little research about the Moraine, and I discovered that EGTourGuide lives on it. Only by one or two hundred feet, but I thought it was funny. Good for you, EGTourGuide, with all those excellent plants growing on that substandard soil, where in the olden days (you kno...