Skip to main content

In Process, April 2010

Manners. First draft novel. 95% complete. While I was at Ad Astra watching a panel on Time Management for Writers, I realized that I just have to finish this thing, so I can move on to something else. It's around 90,000 words, and time to wrap up.

"Dolphin". Short Story. Editing. I decided that it was trying too hard, and took out any sentence that seemed overworked. This got rid of 300+ words. Then I sent it to the TPL writer-in-residence. I also let Ed read it, and he said he didn't understand what was going on with the experiment with the dolphin, and what George's goal was with the surgery on Honorine, so I guess I took out too much. Oh well, back to the drawingboard.
I rewrote the intro and realized that I was just moving things around, and each draft is not better than the last because of that. So I stopped. This story is now up on OWW.

"Bezoar". Short Story. I find myself putting back things I've taken out. I think I'll try one more draft and then let people look at it, too.

"Troll". Short story. 400 words of start.

"Cats". It's a flash fiction that I've typed up and am thinking through.

Popular posts from this blog

In progress: March 2026

Wind/Water/Salt Chapters 39-51 :   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Working on Chapter 3 still, though this one seems more stable. I did work on it quite a bit during Chapter 2. 1-3 are in the same locale so it made sense to work on them together. Maybe I'll continue in this vein, doing the next locale all together too.  Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). I added markers at each pattern repeat. Hopefully that will make it easier to work on.   Summer in Tokyo  (Isager):Started the month with eleven rows left on the second sleeve, the yoke, and the finishing to go. And as I wanted, I finished this and now I can wear it for a little while before sweater weather is over until fall. I could not follow the yoke short row instructions as written so I did my best to make it look like th...

In progress -- February 2026

Wind/Water/Salt  Chapters 39-51:   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Decided it's time to move on from Chapter 2, posted it and now I guess I'll work on Chapter 3 for 6 months.   Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager):Started the month maybe 14 rows from the armholes. I finished the body and a sleeve. It would be nice to be able to wear this in March. So, eleven rows of a sleeve, the yoke, and the finishing to go. Ankylosaur  (Knitty). Ed shrank his, so I guess they're mine now? I started another pair for him because he was so sad, and also because socks are portable so it's always good to have one going.  Sashiko project:   Nothing.  Ruffle skirt:  Did the waistband and I'm calling i...

In progress - January 2026

  Wind/Water/Salt  Chapters 39-51:   Nothing  Persephone  (probably not its real name): NOthing Vinterlys:  Worked on Chapter 2 some more.  Critted  4  Got back  1 Submissions  0  Out there   0   Rejects   0 Knitting Georgia  (Norah Gaughan). Started the month with one sleeve and half a front to go. Finished. Love this sweater.  Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager): Started. I was looking at the pictures and the charts, and the pattern as written is not what is in the pictures! So odd. I am going to finish up two cones of yarn with this project! Pretty exciting. I hope I don't run out of light blue.  I was working along on it, and if you go and look at the sweater, it's knit bottom-up, and I was at the part where I only had two colors, about 5" maybe. And I was thinking, "wow, this is pretty ugly! Maybe I should stop...