Skip to main content

My tongue sweats

All right, I finished the fair isle vest. I even wore it all day on Tuesday, and it didn't fall apart. I steeked the armholes and the neck, and the stitches did not start to stick out by the end of the day (I think I took it off at about 10:20 after band practice, so I wore it for about 14.5 hours). You have to understand, I'm always afraid things I made myself are going to fall apart as I walk around. Especially things I sew. But they generally don't. It's the stuff I buy at Le Chateau that usually collapses on my body.

Perhaps I should take a picture of the vest. I'll put that on my weekend list.


Sting - done! Posted by Hello

So I finished one thing. I want so badly to start a new project, but I have three other sweaters started, and a swatch that is abandoned that I foolishly wrote in my project list, so I have to either return to it and come up with a purpose for it, or... well, there isn't an or. I returned to the sleeve of Admonition. I'd like to finish that before it's too warm to knit with aran-weight mohair (that will be tomorrow, now I've said something). I've redesigned the sleeves, and almost finished one, and it's a much funner knit now. Honestly, before it was punishment. Perhaps I'll finish the sleeve tonight and start the other sleeve, and the body.

I've also been working on Manhattan. The back is still done. Maybe I should block it to see if the curl in the ribbing is permanent, and if I have to come up with some clever way to make it stay down. Maybe I'll start a sleeve of that to try to trick myself into thinking I'm starting a new project. It's not going to work. Really, I want to try out AS' Aberlady from CC.

Popular posts from this blog

In progress: March 2026

Wind/Water/Salt Chapters 39-51 :   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Working on Chapter 3 still, though this one seems more stable. I did work on it quite a bit during Chapter 2. 1-3 are in the same locale so it made sense to work on them together. Maybe I'll continue in this vein, doing the next locale all together too.  Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). I added markers at each pattern repeat. Hopefully that will make it easier to work on.   Summer in Tokyo  (Isager):Started the month with eleven rows left on the second sleeve, the yoke, and the finishing to go. And as I wanted, I finished this and now I can wear it for a little while before sweater weather is over until fall. I could not follow the yoke short row instructions as written so I did my best to make it look like th...

In progress - January 2026

  Wind/Water/Salt  Chapters 39-51:   Nothing  Persephone  (probably not its real name): NOthing Vinterlys:  Worked on Chapter 2 some more.  Critted  4  Got back  1 Submissions  0  Out there   0   Rejects   0 Knitting Georgia  (Norah Gaughan). Started the month with one sleeve and half a front to go. Finished. Love this sweater.  Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager): Started. I was looking at the pictures and the charts, and the pattern as written is not what is in the pictures! So odd. I am going to finish up two cones of yarn with this project! Pretty exciting. I hope I don't run out of light blue.  I was working along on it, and if you go and look at the sweater, it's knit bottom-up, and I was at the part where I only had two colors, about 5" maybe. And I was thinking, "wow, this is pretty ugly! Maybe I should stop...

In progress -- February 2026

Wind/Water/Salt  Chapters 39-51:   Nothing.  Persephone  (probably not its real name): Nothing.  Vinterlys:  Decided it's time to move on from Chapter 2, posted it and now I guess I'll work on Chapter 3 for 6 months.   Critted  4  Got back  3 Submissions  0  Out there   0   Rejects   0 Knitting Aberlady  (AS Celtic Collection). Did a few rows while listening to podcasts.  Summer in Tokyo  (Isager):Started the month maybe 14 rows from the armholes. I finished the body and a sleeve. It would be nice to be able to wear this in March. So, eleven rows of a sleeve, the yoke, and the finishing to go. Ankylosaur  (Knitty). Ed shrank his, so I guess they're mine now? I started another pair for him because he was so sad, and also because socks are portable so it's always good to have one going.  Sashiko project:   Nothing.  Ruffle skirt:  Did the waistband and I'm calling i...