Skip to main content

In Progress: November 2025


 Wind/Water/Salt Chapters 39-51: Nothing

Persephone (probably not its real name): Nothing
Vinterlys: Worked on Chapter 2 some more. 
Critted 4 Got back 0 as I posted nothing. 
Submissions 0 Out there 0 Rejects 0
Knitting
  • Hamilton (Self). Started the month by picking up the stitches around the neck. I blew myself away by picking up the same number on the left and the right without actually counting. Finished the fair isle portion of this, just a tiny bit of knitting a hem and then it's the endless finishing. 
  • Georgia (Norah Gaughan). Started the month with one sleeve and one flounce done, and the back started. Finished the back and started a front. It's so fast compared to everything else! 
  • Undertoe socks (knitty). Started the month on the second sock. Finished! 
  • Ankylosaur socks (knitty). I found this surprisingly unpleasant to work on! Did half of the first sock. 
  • Aberlady (AS Celtic Collection). Made my working chart. This will be a good portable project, once started. 
Sashiko project: Actually looked at it? After a year of ignoring it, I think I could probably work on it now, I don't hate it anymore. 

Ruffle skirt: Hemmed this sucker, now just the waistband left. 

Purple Romper: I think I'm going to have to abandon this one. 

Nikka Pants: Nothing. 

Pyjamas (repair): Made a couple of patches and sewed the first one.