Skip to main content

In progress, July 2024

 



Wind/Water/Salt Chapters 39-51: Still need to take up comments and revise. 

Persephone (probably not its real name): Continued to think thoughts. 
Short Stories:  Rewrote the ending of the story I pulled out last month. Started a couple of other short stories, but they're more percolating. 
Critted 3 Got back 1
Submissions 0 Out there 0 Rejects 0
Knitting
  • Cathar (self). Started the month in the color work of sleeve 2. Due to a 10-hour round trip in the car to Cleveland one weekend, I finished the sleeve and attached it to the body. Then due to listening to an audio book, I did two inches. Every row is shorter than the last! Hope to finish the fair isle portion in August. 
  • Blushing Cloud (Knitty S/S24). Started the month with (still) three inches of back done. Socks take priority. 
  • Rainbow II. Finished both. 

Sashiko project: Nothing. 

Ruffle skirt: Nothing. 

Purple Romper: I'd love to wear this this summer. Unfortunately, that means I'd have to work on it. Maybe on Simcoe day? 

Popular posts from this blog

Best TW feedback ever

Over at the dayjob, SMEs are feverishly trying to get documents back to me all marked up, in preparation for the release that's supposed to happen the week I'm back from VP. Today's best comment: Unfortunately not true. SMEs, they're so cute.

In progress: August 2024

Wind/Water/Salt  Chapters 39-51:   Still n eed to take up comments and revise.  Persephone  (probably not its real name): Continued to think thoughts.  Short Stories:   After posting that short story from last month onto the workshop, I picked one of those short stories I'd started and forced a plot onto it.  Critted  5  Got back  4 Submissions  0  Out there   0   Rejects   0 Knitting Cathar  (self). Started month with two inches done above the armholes. Listening to audiobooks, I finished the fair isle portion, cut the steeks, and set up and knit the neckline. Just the endless finishing now.   Blushing Cloud  (Knitty S/S24). Started the month with (still) three inches of back done. Socks take priority.  Elbrus socks (Knitty first fall 2024). Finished.  Elbrus socks II . Started the first.  Pole shorts  (Joan McGowan-Michael). I knitted these several years ago, but the...

Moraine

So a couple of days I thought I was done with this short story, and I wrote the last line of the story. I even dated it (that's how I can tell it's over). It was a little long, at 6600 words (I was aiming for 5000). But then I was walking to work, and I thought, "My, that was a lame ending. My endings are all crap." So yesterday morning, I scribbled out the date and wrote a bit more. And this morning I wrote a bit more again, and I dated it and called it done. And still, that ending seemed lame. So a few minutes later, in the last paragraph, I scratched out "the Oak Ridges Moraine" and wrote in "that stupid moraine". Much better. Now I can move on. But in the meantime, I was doing a little research about the Moraine, and I discovered that EGTourGuide lives on it. Only by one or two hundred feet, but I thought it was funny. Good for you, EGTourGuide, with all those excellent plants growing on that substandard soil, where in the olden days (you kno...